Przejdź do treści
Executed by: ALTECH-SYSTEM ALTECH-SYSTEM

Power Grid & Telecom Networks

Design and construction of power grid networks — from connections to transformer stations. We work with distribution network operators across Poland and abroad.

Zdjęcie wkrótce
01
from 12,000 PLN* from 35,000 PLN* 2-4 months*
01 / 07

LV/MV connections

Construction of low and medium voltage power connections for residential, commercial and industrial facilities. We handle the complete process — from agreements with the grid operator (TAURON, PGE, Energa), through design, to construction and technical acceptance.

Individual client Business client
TAURON PGE Enea IRiESD Energa PSE innogy Stoen Operator

Included

  • Connection conditions application
  • Detailed design
  • DSO coordination
  • Construction and acceptance
  • As-built documentation

Required certifications

SEP kat. E do 1 kV SEP kat. D do 1 kV Uprawnienia budowlane el. bez ograniczeń

“The entire LV connection process handled by ALTECH from A to Z. Clean documentation, deadlines met.”

— Tomasz W., private investor
Zdjęcie wkrótce
02
individual quote* individual*
02 / 07

Cable lines

Installation of LV and MV cable lines in trenches, cable ducts and on cable trays. We use YAKXS, NA2XS(F)2Y and other cables in accordance with project requirements. We perform cable termination, joint installation and insulation measurements after laying.

Business client
YAKXS NA2XS(F)2Y YKY PN-HD 603 Tele-Fonika Bitner NKT Nexans Prysmian Eltrox

Included

  • Cable route design
  • Trenching and sand bedding
  • YAKXS/NA2XSY cable laying
  • Joints and terminations
  • Insulation measurements

Required certifications

SEP kat. E do 15 kV SEP kat. D do 15 kV Uprawnienia budowlane el.
Zdjęcie wkrótce
03
from 80,000 PLN* 3-6 months*
03 / 07

Transformer stations

Construction and modernisation of 15/0.4 kV transformer stations — pole-mounted, indoor and containerised. We install transformers, MV/LV switchgear, metering systems and protection systems. We deliver turnkey projects including MV connections.

Business client
ABB Schneider ZPUE IEC 62271 Siemens Eaton Eltel Cooper Power GE Grid Solutions

Included

  • Building and execution design
  • Container or brick station
  • 15/0.4 kV transformer
  • MV and LV switchgear
  • Commissioning and DSO acceptance

Required certifications

SEP kat. E powyżej 1 kV SEP kat. D powyżej 1 kV Uprawnienia budowlane el. bez ograniczeń
Zdjęcie wkrótce
04
4-8 weeks*
04 / 07

Overhead networks

Construction and reconstruction of overhead LV and MV power lines. We erect concrete, wooden and metal poles. We install insulated AsXSn conductors and bare AFL conductors. We also carry out dismantling of old overhead lines.

Business client
AsXSn AFL PN-EN 50341 Tele-Fonika NKT Belos-PLP Nexans

Included

  • Overhead line design
  • Concrete/wood/steel poles
  • AsXSn or AFL conductors
  • Line accessories
  • Measurements and acceptance

Required certifications

SEP kat. E powyżej 1 kV Uprawnienia budowlane el.
Zdjęcie wkrótce
05
2-6 weeks*
05 / 07

Telecommunications networks

Construction of fibre-optic and copper telecommunications networks. We lay fibre-optic and copper cables in telecom ducts, perform fibre splicing, OTDR reflectometric measurements and technical acceptance for telecommunications operators.

Individual client Business client
ITU-T G.652 OTDR Cat 6/6A Corning Belden R&M Panduit Commscope Optromix

Included

  • Network design
  • Fibre or copper cables
  • Fibre splicing
  • OTDR measurements
  • Acceptance protocol

Required certifications

SEP kat. E do 1 kV Świadectwo kwalifikacji teletechnicznej
Zdjęcie wkrótce
06
2-8 weeks*
06 / 07

Telecom duct systems

Construction of telecom duct systems using RHDPE pipes, DVR and microduct systems. We build complete duct runs including cable chambers SK-1 and SK-2. We carry out road crossings using pipe jacking or drilling methods.

Business client
RHDPE SK-1 SK-2 BN-73/8984-12 Wavin Pipelife Stomil Plasson Geberit

Included

  • Route design
  • RHDPE/DVR pipes
  • Cable chambers SK-1/SK-2
  • Road crossings
  • As-built survey

Required certifications

Uprawnienia budowlane teletech.
Zdjęcie wkrótce
07
from 250 PLN/m* 2-7 days*
07 / 07

HDD directional drilling

Underground crossings using horizontal directional drilling (HDD) technology. This method enables crossings under roads, railway tracks, rivers and other obstacles without excavating the surface. We carry out drills from 63 mm to 315 mm in diameter.

Business client
HDD Vermeer Ditch Witch 63-315 mm TT-Technologies Tracto-Technik Prime Drilling American Augers

Included

  • Geotechnical analysis
  • Pilot drilling
  • Reaming
  • Pipeline pulling
  • Drill survey

Required certifications

Uprawnienia operatora wiertnicy HDD BHP - prace ziemne

* Prices and timelines are indicative — based on average past projects and may vary depending on scope, location and complexity. Each quote is prepared individually after a site visit or project review. This information does not constitute an offer within the meaning of Article 66 § 1 of the Polish Civil Code.

How we work

A proven process — from first contact to documentation handover.

01

Consultation

Free needs analysis and site survey.

02

Design

Technical documentation and cost estimate.

03

Implementation

Professional installation by a qualified team.

04

Acceptance

Measurements, protocols and documentation.

Frequently asked questions

The timeline depends on many factors — location, route length, required approvals and ground conditions. A typical LV connection is completed within 2-4 weeks of obtaining connection conditions. MV connections requiring transformer station construction may take 2-4 months.
Yes, we offer comprehensive support throughout the connection process. We prepare the application for connection conditions, coordinate approvals with the distribution network operator (TAURON, PGE), develop the design documentation and carry out construction through to technical acceptance.
We have equipment for directional drilling up to 200 metres in length and diameters from 63 mm to 315 mm. We perform crossings under national and regional roads, railway tracks, rivers and other obstacles. Every drill is preceded by a geotechnical analysis of the route.
Yes, we have many years of experience working with grid operators — TAURON Dystrybucja, PGE Dystrybucja and Energa Operator. We deliver grid investment projects on their behalf, including new cable line construction, transformer station modernisation and overhead network expansion.

Need a power connection or grid network?

Contact us — we will advise and prepare a free quote.